Completion date: August 12, 2025
Location: Tea, SD

Solutions Provided:

Containments with zipper access were installed at both openings to isolate the work area. One air scrubber and one dehumidifier were set up on both the upper and lower levels to stabilize conditions. Demolition included removal of laminate flooring in the lower level and full gut of the lower closet to access and address affected materials.

 